FTTH fiber-to-the-home solutions
Optical communication component solutions

The First 5g City Is Launching In Kazakhstan

Browse technical resources about fiber optic tools, passive components, network infrastructure, and deployment solutions.

  • What is the name of the cable tray in the vertical shaft

    What is the name of the cable tray in the vertical shaft

    Several types of tray are used in different applications. A solid-bottom tray provides the maximum protection to cables, but requires cutting the tray or using fittings to enter or exit cables. A deep, solid enclosure for cables is called a cable channel or cable trough. A ventilated tray has openings in the bottom of the tray, allowing some air circulation around the cables, water drainage, and allowing some dust to fall through the tray. Small cables may exit the tray throug.


  • The bottom of the 10kV cabinet should be grounded with a copper busbar

    The bottom of the 10kV cabinet should be grounded with a copper busbar

    The following guidelines should be observed when grounding a cabinet: An unpainted earth reference plane or rail must be installed on the floor of the cabinet for the conventional reference potential. The cabinet was “grounded” to the system neutral—but not properly “earthed” to the soil electrode system. The practical takeaway: Industrial electrical cabinets require BOTH proper grounding (for signal reference and circuit operation) AND earthing (for safety and fault protection). Confusing these. For systems with 110kV and above, where the neutral point is effectively grounded, the metal sheath of single-core cables should be directly connected to the substation grounding device through a grounding switch. At the terminal stations where cables transition to overhead lines in systems of. At the heart of a good grounding scheme is the ground bus bar: a solid, low-impedance conductor that ties all equipment grounding conductors (EGCs) together and connects them to the grounding electrode system. All metal parts of the cabinet are connected with each other. In the fixing of foundation steel, level and total station are utilized for repeated.

    [PDF Version]
  • Afghanistan FOB Price CFP22 5G

    Afghanistan FOB Price CFP22 5G

    The base started operating in 2006, and between 2007 and 22 July 2013, it was the headquarters of the Danish Battle Group, the British used the base between 2006 and 2014 when the base was closed by Marine Special operations Team 8213 from, under (OP H). Despite the draw-down of British troops, this base has been expanded by This is a list of North Atlantic Treaty Organization (NATO) installations in Afghanistan used during the from 2001 to 2021. This list encompasses installations used by the from 2001 to 2014 and then by the after 2014. Included are airbases,,, combat outposts,, and patrol bases used by NATO forces across the six regional commands (renamed Train Advise Assist C.

    [PDF Version]

More industry information

Contact Us

We Look Forward to Working with You

Contact Information

Phone +27 64 827 3915
Address Unit 9, Highveld Technopark, 43 Atlas Road, Johannesburg, 2196, South Africa

Send an Inquiry